View Single Post
  #50  
Old 30-07-2013
Gavin Collingwood Gavin Collingwood is offline
Mad Member
 
Join Date: Jul 2007
Posts: 1,427
Default

Here are my thoughts.
1. A roof is needed. But track should be priority.
2. Don't need multi surface, Broxtowe and stotfold are mint so that's what we need to look to and aim for.
3. We need to hire someone to do this as nobody will actually put the time in to do this and we also don't reallyhave the expertise. so we need a track builder to help us hopefully we can find one on oople.
4. I agree totally with you buds. This should be a big priority over winter.
5. Table tops like broxtowe rather than "jumps" is what we want, just jumping off a ramp to flat is crap. Whereas trying to judge a jump bank to bank is way more fun.
6. Level changes is what we need the most and redesigning of current features. As they're not great, and like you said bud. Stu even you'll admit they weren't as you designed because of the council so lets make them how they were supposed to be. I think Cross is too 'stop, start, stop, start' and there's no flow. If it could be made a little less harsh that would be good.
__________________
TLR
ABSIMA
Horizon Hobbies
G Paint
Answer RC
Reply With Quote