|
#1
|
|||
|
|||
![]()
We have been doing some work at the track to improve the corner at the end of the straight. The wooden boards are being replaced by a taller breeze block wall which will support a banked curve. We have also dug a footing for a wall between the main straight and the lighting pole, which will allow us to build a raised section similar to that at Kidi. All changes will be completed by the start of April when we go back outside to race...
![]() ![]() ![]() |
|
|