|
#1
|
|||
|
|||
Track work, YOUR club needs you!
Anybody up for a track work day?
I am thinking about organising a track work day soon, it would need to be a week day so I can get a digger down there! I would like to get some drainage put in draining in to a sump near the 1/10th rostrum and sort out the abortion at the top of the main straight. If time allows it would be nice to level off the back straight as well. I can organise a wacker, digger, disc cutter etc so we just need some man power! It would be good to get this done before winter sets in, I was thinking about a Thursday maybe but can work around what ever day is best for you! With the drainage installed the track will be more useable through winter. So who can help? |
|
|