Go Back   oOple.com Forums > Car Talk > X-Factory

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #39  
Old 25-05-2006
YoungChazz's Avatar
YoungChazz YoungChazz is offline
Mad Member
 
Join Date: Mar 2006
Posts: 1,073
Default

I'm just crazy busy now so it's been a while since I had time to check back here.

We've told all the Team we'll ship them their test cars about June 5 - 6. We'll use fastest shipping, and hope Chris & Dan have The New Math June 8 or 9. They'll have all prototype molded parts, however one mold will not be done until late in June.

That mold makes the servo mount and battery hold-down. We've torqued the machine shop around so they can do all the other molds and make a very short production run, we hope, by June 2nd. Then they'll start on the last mold. All the others are now in various stages of completion.

So the Boys will use Losi servo mounts & xx-4 battery posts. We'll secure the batteries with strapping tape, or something.

We even expect to have the first cut of a J Concepts-designed and -produced body with the Boys' paint schemes on them. The first art work has come through from Jason, and it's major.

So they'll have full prototype cars, even including the Lunsford Ti hinge pins (We received the short run yesterday) and our own threaded inserts (Short run should be done tomorrow.). Chassis, nose piece, shock tower, trans case, rear control arms, wing mounts, bottom covers, toe-in bars, motor plate, everything.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 04:53 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
oOple.com