Quote:
Originally Posted by alcyon
yep, thats becuase you have minimum wage. in malaysia ..well we are a sweatshop ....
|
Well Rama, what do you think it will cost in your sweatshop?
Ive also had a rethink on the gearbox sides, and believe if I go the whole hog and CF all the way to the chassis I may be able to add two attachment points onto the pivot blocks (one on either side) as I am having issues with the plastic bottom sections. I will have a proto made with all my issues so far resolved and the bottom added and also get the pivot blocks made as well and hopefully get this on the road.
Ive got a few things to do such as drill holes through the grain on CF pivot blocks as fibrelyte wont do that for me and then cut some brass tubing and glue in the holes giving strength and then hopefully fit with zero problems and hopefully game on.